System Design and
Installation Overview
- Telephone conference
with Client or Client's agent to determine need and scope of work.
- Initiate a Design
Consultation Contract.
- Meeting with Client
to determine desired features and establish a budget.
- Work up preliminary
design and preliminary budget.
- Review and Sign
off meeting with Client.
- Initiate System
Design Contract or System Installation Contract depending on the scope
of work determined during Client meetings.
- Meeting with General
contractor and Sub contractors to determine schedule and get exact equipment
listings.
- Begin Final System
Design.
- Prewire of control
system, telephone system, network, etc..
- Continue final
system design work, review program logic and TS design.
- Survey prewire
prior to sheetrock and finish.
- Finalize system
features with Client.
- Purchase control
system Hardware.
- System software
design finalized, programming started.
- Set up and burn
in system hardware at shop prior to install.
- Final trim work
completed on site, all sub systems installed and operating.
- Install control
system hardware on site.
- Finalize control
system software on site.
- Walk through with
Client, provide preliminary user manuals.
- Month later return
and fine tune control software, provide final user manuals.
|
|

       |
|